Installation Time of Shower Screens may seem to be a small thing, but when it comes to time-saving in a highly charged environment like Singapore, it can be a key concept that either makes or breaks your bathroom renovation schedule. You are not simply adding a piece of glass. You are sourcing contractors, handling space constraints, and ensuring your shower area is waterproof and usable within as few hours as possible.
If you’re wondering how long you’ll be without your bathroom, this guide gives you clear answers. Whether it is an HDB flat or a personal condo, we will show you the process, duration, and behind-the-scenes mechanism during the Installation Time of Shower Screens in Singapore.
Why Understanding Shower Screen Installation Time Matters
Whenever there is a delay in an already-initiated renovation, it becomes stressful. A simple task like installing a shower screen can cause inconvenience if you do not plan it well. Most people assume the job is quick, but that’s not always the case.
- You might need to wait for custom glass fabrication.
- You may face delays due to condo or MCST rules.
- And if your bathroom layout is tight, installation can take longer.
That’s why knowing the Installation Time of Shower Screens in Singapore is more than just a detail. It’s a practical step to avoid unnecessary trouble.
What Affects the Installation Time of Shower Screens?
Let’s look at the key factors that determine how long your shower screen installation will take in Singapore.
1. Type of Shower Screen
The design and mechanism of the screen heavily affect the total installation time.
- Fixed Glass Panel: This is the simplest and fastest to install. Most fixed panels can be completed in 1 to 2 hours if the wall and floor are ready and even.
- Swing Door Shower Screen: These take more time because hinges need to be mounted precisely, and the door must align perfectly. Expect 2 to 3 hours.
- Sliding Door Shower Screen: These are the most complicated since they use a rail and roller system. It is installed in approximately 3 to 4 hours, although it may require more time when the rail needs to be adjusted.

2. Custom vs. Ready-Made Screens
- Ready-Made Shower Screens: These come in standard sizes and are installed relatively fast, usually on the same day as delivery.
- Custom-Made Screens: These are custom-made to fit specific bathroom sizes. The first step is the measurement visit, and then there is a fabrication time of 3 to 5 working days. Then, the real installation occurs. Thus, Time to Fit a Shower Screen, including lead time, can extend as long as a week.
3. Bathroom Condition and Wall Surface
Old HDB bathrooms may have uneven tiles or poor waterproofing. If the wall is not level, installers may need to adjust the fittings or add spacers, increasing the shower screen installation time.
4. Sealant Curing Time
Even after the physical installation, sealants like silicone need to cure. This isn’t active work time, but you need to wait at least 12 to 24 hours before using the shower. Otherwise, water may leak through the gaps or damage the seals.
5. Approval from Management (for Condo Owners)
You may need to apply for renovation approval from the MCST (Management Corporation Strata Title) if you live in a private condo. This can delay your schedule if not applied early. Always submit documents in advance to avoid slowing down the installation time of shower screens in Singapore.
How Long Does It Take to Install a Shower Screen?
Here’s a quick breakdown based on real project timings in Singapore:
| Shower Screen Type | Estimated Installation Time |
| Fixed Glass Panel | 1 – 2 hours |
| Swing Door Shower Screen | 2 – 3 hours |
| Sliding Door Shower Screen | 3 – 4 hours |
| Custom Fabricated Screen | 3 – 5 working days (including fabrication) + 2–4 hours installation |
So in most cases, the installation time of shower screens can be completed within half a day. But if you’re going custom, consider the lead time too.
Step-by-Step Shower Screen Installation in Singapore
Let’s take a closer look at what actually happens during a standard shower screen installation.
1. Measurement Visit
An experienced installer will come to your home and take accurate space measurements. This visit extends normally between 20- 30 minutes.
2. Glass Cutting & Fabrication
When you choose a custom design, you have to send the measurements to the workshop. Depending on the specification, the glass will be cut, polished, drilled, and framed. This requires 3 to 5 working days.
3. Installation Day
The team comes on the planned day with equipment, sealants, glass panels, and accessories. They install the track (for sliding doors), screw the hinges, attach the glass, and put silicone on all joints. Depending on the type, this work will take 2 to 4 hours.
4. Cleaning and Final Checks
The installers will clean the workspace area, wipe clean the screen, and test water tightness. They will also instruct you on how to maintain the screen.

5. Curing time
You have to wait 12 to 24 hours to use the shower. This is important to let the sealant dry and bond fully.
Tips to Make Installation Smoother
- Clear out your bathroom space before the team arrives.
- Confirm if your bathroom wall or floor needs repairs first.
- Inform your condo or apartment management early.
- Choose installation times during the day (typically 9 am to 5 pm) as per HDB rules.
Conclusion
The installation time of shower screens depends on the type, design, and the conditions in your bathroom within your Singapore home. You can expect the work to finish in just a few hours for most ready-made screens. However, when you go custom, expect a greater lead time due to fabrication and site visits.
The idea is that whether it is something very sleek like a fixed panel or a space-saving sliding screen, having all the information allows you to plan better. With strategic planning and working with trusted local contractors, you can have your new shower screen fitted with a little amount of inconvenience but with a lot of satisfaction